Genting Bhd obtained a quia timet injunction on 30 April against Sycal Bhd's Genting Sky City project over unlawful earthworks for the proposed development near the 7,351-room First World Hotel. The High Court ordered the defendants to restore the affected slopes within six months, pay MYR2 million in costs and MYR243,800 in general damages for the proposed project. The 2020 case now sits before the Court of Appeal after a 275-page judgment.

SCCG Take — The ruling enforces strict planning compliance for hillside projects near existing resorts, raising execution risks for developers and reinforcing slope stability as a binding constraint in Malaysian integrated resort zones.

Genting Bhd secured a quia timet injunction preventing earthworks and slope modifications for a proposed hotel development adjacent to its flagship property. The Malaysian High Court ruled the activities unlawful in the absence of valid permissions and ordered the defendants to restore the affected slopes. The decision, first granted on 30 April with full grounds issued on 29 October, requires payment of MYR2 million (US$486,180) in costs and MYR243,800 (US$59,265) in general damages.

As reported by Inside Asian Gaming, the case dates to early 2020 when Genting Highlands Bhd, Genting Malaysia Bhd and First World Hotels and Resorts Sdn Bhd filed suit. The plaintiffs cited risks to structural integrity at the 7,351-room First World Hotel, the largest in the world by room count and central to Resorts World Genting. The dispute centers on land approximately 100 meters northeast where Sycal Bhd and subsidiary GM Aero Support Sdn Bhd planned Genting Sky City.

Court Declaration of Unlawful Earthworks

High Court judge Datuk Aliza Sulaiman declared the earthworks and slope cutting breached the Town and Country Planning Act 1976, the Street, Drainage and Building Act 1974 and National Council of Local Government guidelines on hills and highlands development. The proposed project included 10 blocks of hotels and commercial suites ranging from 27 to 56 stories plus parking facilities. Sulaiman dismissed Genting’s claim for exemplary damages and rejected Sycal’s counterclaim that the suit represented an abuse of process intended to block competition.

The remedies mandate restoration within six months using blockstones of at least nine inches, prohibit further modifications or excavations, and restrain use of support structures. Sulaiman cited site-specific factors including water seepage, drainage conditions and threatened loss of support to occupied buildings, the outer ring road and associated facilities. “The danger was connected to the actual slopes and the works,” she wrote. The defendants have appealed portions of the ruling to the Court of Appeal.

SCCG Media · Daily briefing

Gaming, betting and prediction markets — the desk’s read, every weekday.

Subscribe →

Related

SponsoredBTA Sports — SCCG partnerCoinbase Schedules 2027 Launch of In-House Prediction Markets PlatformDutch KSA Renews JOI Gaming Jacks.nl Licence Through 2031 Despite Two €400,000 Fines
Curated by SCCG · Powered by SCCG Technology